Explainer

The BOPA, in plain English.

What a buitenplanse omgevingsplanactiviteit is, how you apply for one and how long it takes.

Short answer

With a BOPA, short for buitenplanse omgevingsplanactiviteit, you apply for an environmental permit for a plan that does not fit the omgevingsplan (the municipal environment plan). The municipality does not amend the omgevingsplan first, but gives permission to depart from it. It tests whether the plan fits a balanced allocation of functions to locations: whether it sits well with what is already there. Usually the municipality decides within eight weeks, with a possible six-week extension. In the extended procedure it is six months.

Voorbeeldlocatie

Does it fit the plan?

The example from the text: the omgevingsplan allows ten metres, and lets the municipality allow up to twelve. Choose a building height.

Room to deviate: up to 12 mOmgevingsplan: 10 m
Building height

10 m · BinnenplansFits within the plan.

The omgevingsplan allows ten metres.

12 m · BinnenplansFits within the plan.

Through the rule in the plan that lets the municipality allow up to twelve metres.

13 m · BuitenplansDoes not fit: a BOPA may then be a route.

A BOPA does not change the rules of the omgevingsplan. It gives permission for one plan.

The time limit for the decision

Regular procedure8 weeks, can be extended once by 6 weeks
Extended procedure6 months, with a draft decision for inspection first

An example, not a check of a real plan.

Binnenplans or buitenplans

The omgevingsplan says what is allowed at a place. If your plan fits it, possibly through a rule in the plan that gives the municipality room to deviate, it is a binnenplanse omgevingsplanactiviteit (within the plan). If it does not fit, it is a buitenplanse omgevingsplanactiviteit (outside the plan): a BOPA.

An example. The omgevingsplan allows a building height of ten metres, and lets the municipality allow up to twelve. If you want to build to twelve metres, that is within the plan. If you want thirteen, you need a BOPA.

A BOPA does not change the rules of the omgevingsplan. It gives permission for one plan. The municipality later incorporates that permission into the omgevingsplan.

Step by step

  1. The preliminary consultation.

    It often starts with a conversation or a principeverzoek (request in principle) to the municipality, to find out whether it is willing to cooperate with the plan.

  2. Involving the neighbourhood.

    With the application you state whether and how you involved neighbours and other stakeholders. The municipal council can designate cases in which this is mandatory.

  3. The application.

    You apply for the permit through the Omgevingsloket (the national permit portal) and explain why the plan suits that location.

    The application and the decision are published.

  4. The council's advice.

    In cases the municipal council has designated, the college asks the council for advice. That advice is binding, insofar as it rests on the rules a BOPA is tested against.

    1. The decision in the regular procedure.within 8 weeks (+6)

      The municipality decides within eight weeks, and can extend that period once by six weeks. After that you can object and appeal.

    2. Or the decision in the extended procedure.within 6 months

      The municipality first makes a draft decision available for inspection, which anyone can respond to, and decides within six months. This procedure applies if you ask for it, if the law requires it, or if the municipality chooses it for your application.

What it costs

If the BOPA creates a new building possibility, such as homes or a commercial building, the municipality must recover its costs. This is usually done with an anterieure overeenkomst, which the municipality publishes within two weeks of signing.

What does it mean for you?

As a developer

With a BOPA you ask permission for your plan, without the municipality first amending the omgevingsplan for the whole area. The council can have a say. It is wise to involve the neighbourhood early, and in cases the council has designated it is mandatory.

As an investor

A BOPA applied for or granted shows where someone wants to build or use something the omgevingsplan does not allow: a plan that is bigger than, or different from, what is permitted.

As a municipality

The council decides in advance in which cases it wants to advise and when participation is mandatory. That way it keeps a grip on plans that depart from the omgevingsplan.

Permits

How to see it coming

A BOPA is published as a permit: first the application, later the decision. In Revelop those notices are in the permits table, with the legal instrument alongside. There you can filter on "Buitenplanse omgevingsplanactiviteit" and see per area which plans depart from the omgevingsplan.

If you switch on the permits digest for a saved search of addresses, every Monday morning you get the new applications and granted permits in that area, BOPAs included. And if the municipality publishes an anterieure overeenkomst for such a plan, it is in your daily development alert.

Example of the permits table

Legal instrument: Buitenplanse omgevingsplanactiviteit

AddressLegal instrumentStage
Voorbeeldweg 3, VoorbeeldstadBinnenplanse omgevingsplanactiviteitApplication
Voorbeeldweg 8, VoorbeeldstadBuitenplanse omgevingsplanactiviteitApplication
Voorbeeldplein 1, VoorbeeldstadBinnenplanse omgevingsplanactiviteitGranted
Voorbeeldlaan 12, VoorbeeldstadBuitenplanse omgevingsplanactiviteitGranted

Weekly permits digest

Every Monday morning

The new applications and granted permits in your area, BOPAs included.

Which plan?

Basis

€ 200per user / month, excl. VAT

The permits table, the permits digest and the development alerts are included in every plan, from Basis up.

Frequently asked questions about the BOPA

What is the difference between an OPA and a BOPA?

An omgevingsplanactiviteit (OPA) is building or using for which the omgevingsplan sets rules. If the plan fits within those rules, it is within the plan (binnenplans). If it does not, it is outside the plan (buitenplans), and you need a permit for a BOPA.

How do you apply for a BOPA?

Through the Omgevingsloket. You explain why the plan suits that location and state whether and how you involved the neighbourhood. A conversation with the municipality beforehand helps you judge whether it is willing to cooperate.

How long does a BOPA take?

In the regular procedure the municipality decides within eight weeks, and it can extend that period once by six weeks. In the extended procedure it is six months. Objection and appeal come on top of that.

Is participation mandatory for a BOPA?

Only in cases the municipal council has designated for it. In other cases you state with the application whether and how you involved the neighbourhood.

What is the difference between a BOPA and an amendment to the omgevingsplan?

An amendment to the omgevingsplan changes the rules for an area and is adopted by the municipal council. A permit for a BOPA applies to one plan and leaves the rules as they are. The municipality later incorporates the BOPA into the omgevingsplan.

Sources

The legislation, rulings and government guidance this page is based on. The sources are in Dutch.

See what is being published in your municipality.

In thirty minutes we show you which notices are being published in your area and what the alert looks like.

Call me back

Leave your number and we will call you back as soon as we can, on a working day. No calendar, no commitment.

We only use your number to call you back.