Site check

See in seconds what stands in the way on a site.

One click on a building, parcel or address. Revelop tests the site against the sources and shows you, theme by theme, what is going on: policy, environment, infrastructure and market. Every rule shows its source and reference date.

  • 47 site rules
  • 4 themes
  • In every plan
Example location

12 Example Street, Exampletown

Adding storeys
  1. Policy
    No obstacle found

    An extra storey fits under the maximum building height: building now 9 m, maximum 15 m, a storey takes 3 m

    Source: zoning plan
  2. Environment
    Attention

    Noise zones: a noise zone covers the site

    Source: zoning plan
  3. Infrastructure
    Blocking

    Gas: a pipeline runs across the site

    Hard constraint on the site
  4. Market
    Unknown

    Not determined automatically

    Does not weigh in the verdict

Blocking44 of 47 site rules answeredreference date 28 November 2026

Short answer

A site check is a first test of a building site against the rules that apply there and the risks at play. In Revelop you start the check from a building, parcel or address. You get a verdict per theme (policy, environment, infrastructure and market) in four colours, with the source and reference date beside every rule. The verdict says what the sources show; it is not a decision on a permit.

From separate portals to one verdict.

Without the site check

  • The zoning plan, the Bodemloket, the Klimaateffectatlas, the risk map and the capacity map: every portal opened on its own.
  • The same list worked through again for every location, in your own Excel.
  • No date on what you found. In a month nobody knows whether it still holds.

With the site check

  • One click, and the sources have been checked for your site.
  • The same 47 rules every time, in the same order.
  • The source and reference date beside every rule. After thirty days you can see that a check is out of date.

Know where you stand at a glance.

Every rule gets one of four verdicts, with its source and reference date. You see at once whether a site has potential and what stands in the way.

No obstacle found

Our sources show nothing that stands in the way of your plan.

Attention

Something calls for weighing up, a survey or a departure from the plan.

Blocking

Only for a hard constraint on the site, such as a gas pipeline.

Unknown

Not determined automatically. You see which source to consult yourself, and it does not weigh in the verdict.

What the check goes through.

  • Zoning plan
  • BGT and AHN
  • Klimaateffectatlas
  • Basisregistratie Ondergrond
  • Bodemloket
  • Register externe veiligheid
  • Natura 2000
  • + and many more
  • Policy

    Zoning and dimensions from the plan in force. Choose what you want to do (new build, adding storeys, extension, conversion or splitting) and the check tests against that.

  • Environment

    Noise zones, odour, nuisance contours around businesses, Natura 2000 and nitrogen, flood risk, soil, external safety and protected species.

  • Infrastructure

    Pipes and cables on the site, grid capacity for drawing power and feeding it back, and road access.

  • Market

    Signals from the market around the location, such as how long new homes nearby take to sell.

Example locationBlockingreference date 28 November 2026

Not one location, but your whole list.

In the buildings and parcels tables, the site check is a column and a filter. Select what you want to assess, run the check on your selection and keep what stays green.

Example listNo obstacle found
AddressSite check
2 Example StreetNo obstacle found
4 Example StreetAttention
6 Example StreetNo obstacle found
8 Example StreetUnknown
10 Example StreetBlocking
In a study · Team

Beyond the first test: the environment analysis in 83 points.

Turn a location into a study and Revelop works through the full MiniGIM environment analysis list, from soil and cables to noise and ecology. For 73 of the 83 points Revelop has an automatic check. You fill in the rest yourself.

  • A status per point: open, in progress, resolved or not applicable. Your team sees what is still outstanding.
  • A comparable permit nearby turns red into orange, with the route alongside. A precedent obliges the municipality to give reasons for a refusal; it is not a permit.
  • The subsoil of the whole plan area, with a cross-section. An indication, not geotechnical advice.
73of 83
  • Checked automatically
  • You fill it in

One A4 to pass on.

Send the check as a one-page PDF to your team, your investor or the municipality, so everyone works from the same page. In the Location analysis report (PDF or Word, with your own logo on the cover) it sits beside the property, the parcel and the neighbourhood.

Which plan is it in?

Basis

€ 200per user / month, excl. VAT

The site check is in every plan, Basis included.

Team

€ 400per user / month, excl. VAT

Studies, with the 83-point environment analysis, are in Team and Enterprise.

Frequently asked questions about the site check

Does green mean I will get a permit?

No. Green means our sources show nothing that stands in the way of the location. The decision on a permit is the municipality's.

Does the site check replace a soil survey or an ecological quick scan?

No. The check shows what is known from the sources and where a survey is likely to be needed. A cone penetration test, foundation advice or an ecological quick scan is still work for a specialist.

How current is a verdict?

Every rule shows the reference date of its source. A check older than thirty days is labelled out of date, with the verdict from that time kept alongside.

Which sources does the check use?

A large number of public and commercial data sources. A few examples: the zoning plan, the BGT, the AHN, the Klimaateffectatlas, the Basisregistratie Ondergrond, the Bodemloket, the Register externe veiligheid and Natura 2000.

Can I assess a whole list of locations at once?

Yes. In the buildings and parcels tables you run the check on your selection and then filter on the verdict.

Which plan includes the site check?

Every plan. The environment analysis in 83 points belongs to a study, and studies are in Team and Enterprise.

See it on your own site.

In thirty minutes we show the site check on addresses from your own municipality or portfolio.