Revelop uses the sliding scale in the municipality's published fees by-law and names it as the source. If we do not have the by-law, you see that the fees are an example value.
The residual land value is what you can pay for the land when the revenue has to carry all other costs. Revelop works it out from your design, with the costs per category following the NEN 2699 structure, your own cost figures and the municipality's fees.
Revenue€ 8,181,818
A worked example with example values. In Revelop you work with your own figures.
The residual land value is what you can pay for the land when your plan's revenue has to carry all other costs. You subtract the development costs, from construction to financing, from the revenue excluding VAT. Those costs fall into categories A to G of the NEN 2699 structure. What is left is the land balance. Because you buy the land long before you sell, the interest over that period, the notary and sometimes transfer tax come off as well. What remains is the purchase price you can offer.
The land is what is left once every other cost is paid. That is why a small overrun on construction costs eats up a large share of the land value. Pick a scenario and watch what happens to the purchase price.
Under the result you see what the land value does if construction costs come out higher or the interest rate rises. A land value below zero gets a minus sign and the label ‘Attention’.
A development cost breakdown divides all the costs of a plan into seven categories, following the NEN 2699 structure.
Buying the land, demolition, site preparation and the contribution to the municipality.
Example location€ 192,000
The building including the contractor's overheads, plus external works and parking.
Example location€ 5,041,721
Operational installations and loose furnishings. Usually nil for housing.
Example location€ 0
Professional fees, utility connections, municipal fees, the developer's costs and profit, sales costs and the notary.
Example location€ 1,763,808
A buffer for what you do not know yet.
Example location€ 303,764
Transfer tax on the land, if the purchase is not subject to VAT.
Example location€ 0
Interest during construction, and on the land from purchase to completion.
Example location€ 273,387
The development cost breakdown belongs to a study of your site. The programme and the massing come from the design, the check against the environment plan (omgevingsplan) sits beside it, and the costs are based on your own organisation's cost figures.
At what land price is the margin zero?
Revelop AIWorked out in a separate variant. Your study stays unchanged.
FeesExampletown fees by-law
Revelop uses the sliding scale in the municipality's published fees by-law and names it as the source. If we do not have the by-law, you see that the fees are an example value.
This is where the most money is tied up
When does the money go out and when does it come back? From buying the land, through construction, to completion.
Start a study from a tender and Revelop takes the conditions from the tender documents, including the minimum price for the land. Once you confirm them, your maximum bid appears beside the minimum price, with the headroom in between. The bid is the residual land value minus your own bid margin.
€ 400per user / month, excl. VAT
Studies with the development costs and the residual land value are in Team, with everything from Basis included.
Also in Enterprise.
In thirty minutes we show you how a study works out the land value for a site you choose.
Call me back
Leave your number and we will call you back as soon as we can, on a working day. No calendar, no commitment.