Development costs and land value

What is the land worth?

The residual land value is what you can pay for the land when the revenue has to carry all other costs. Revelop works it out from your design, with the costs per category following the NEN 2699 structure, your own cost figures and the municipality's fees.

  • Following the NEN 2699 structure
  • With your own cost figures
  • In the Team plan
Example locationexample values24 flats · plot of 1,200 m²

Revenue€ 8,181,818

Residual land value (purchase price)€ 520,144€ 21,673 per home · land share 6.4%
  1. A Land costs€ 192,000
  2. B Construction costs€ 5,041,721
  3. C Fit-out costs€ 0
  4. D Additional costs€ 1,763,808
  5. E Contingency€ 303,764
  6. F Taxes€ 0
  7. G Financing€ 273,387
  8. Land balance€ 607,138
  9. Interest, notary and estate agent on the land− € 86,994

A worked example with example values. In Revelop you work with your own figures.

Short answer

The residual land value is what you can pay for the land when your plan's revenue has to carry all other costs. You subtract the development costs, from construction to financing, from the revenue excluding VAT. Those costs fall into categories A to G of the NEN 2699 structure. What is left is the land balance. Because you buy the land long before you sell, the interest over that period, the notary and sometimes transfer tax come off as well. What remains is the purchase price you can offer.

Sensitivity

Nudge the construction costs.

The land is what is left once every other cost is paid. That is why a small overrun on construction costs eats up a large share of the land value. Pick a scenario and watch what happens to the purchase price.

Under the result you see what the land value does if construction costs come out higher or the interest rate rises. A land value below zero gets a minus sign and the label ‘Attention’.

Example locationResidual land value (purchase price)€ 520,144
  • In the base caseland value € 520,144
  • If construction costs are 5% higher− € 310,985land value € 209,159
  • If the interest rate rises by 0.5 percentage points− € 24,901land value € 495,243

From a standalone spreadsheet to a cost breakdown that keeps up.

Without Revelop

  • The cost breakdown lives in a spreadsheet someone once set up. Only its maker knows what each cell does.
  • You take construction costs from the last project and the fees from the municipality's by-law.
  • One more storey or a start a year later, and you go through the whole sheet again.

With Revelop

  • The cost breakdown belongs to the design. Change the programme or the massing and the land value changes with it.
  • You work with your own organisation's cost figures, with the source and price level beside every number.
  • The fees come from the municipality's by-law, and under the result you see how sensitive the land value is.

The cost breakdown from A to G.

A development cost breakdown divides all the costs of a plan into seven categories, following the NEN 2699 structure.

A Land costs

Buying the land, demolition, site preparation and the contribution to the municipality.

Example location€ 192,000

B Construction costs

The building including the contractor's overheads, plus external works and parking.

Example location€ 5,041,721

C Fit-out costs

Operational installations and loose furnishings. Usually nil for housing.

Example location€ 0

D Additional costs

Professional fees, utility connections, municipal fees, the developer's costs and profit, sales costs and the notary.

Example location€ 1,763,808

E Contingency

A buffer for what you do not know yet.

Example location€ 303,764

F Taxes

Transfer tax on the land, if the purchase is not subject to VAT.

Example location€ 0

G Financing

Interest during construction, and on the land from purchase to completion.

Example location€ 273,387

In a study · Team

In Revelop the cost breakdown follows the design.

The development cost breakdown belongs to a study of your site. The programme and the massing come from the design, the check against the environment plan (omgevingsplan) sits beside it, and the costs are based on your own organisation's cost figures.

  • You record your cost figures once in the Assumptions sheet, with the source and price level beside every number. Anything you have not filled in yourself yet is marked as an example value.
  • Revelop does not supply construction costs: you work with your own figures. Next to your sales price is a market reference per home type, for guidance.
  • Every variant has its own cost breakdown, so you can compare variants on land value.
  • Ask Revelop AI, the analyst who has all the data of the Netherlands at hand: ‘At what land price is the margin zero?’ It runs the numbers without changing your study.
Example locationAssumptions
  • Construction costs per m² GFA, flatprice level 2026-Q1own figure
  • Additional costsprice level 2026-Q1own figure
  • Developer's profit and riskprice level 2026-Q1own figure
  • Interestprice level 2026-Q1own figure

At what land price is the margin zero?

Revelop AIWorked out in a separate variant. Your study stays unchanged.

The municipality's fees, and what if?

Example location

FeesExampletown fees by-law

Fees per municipality

Revelop uses the sliding scale in the municipality's published fees by-law and names it as the source. If we do not have the by-law, you see that the fees are an example value.

Example location · Cumulative, not discounted
  1. land purchase
  2. construction starts
  3. completion

This is where the most money is tied up

Cash flow

When does the money go out and when does it come back? From buying the land, through construction, to completion.

Tenders

Your bid beside the minimum price.

Start a study from a tender and Revelop takes the conditions from the tender documents, including the minimum price for the land. Once you confirm them, your maximum bid appears beside the minimum price, with the headroom in between. The bid is the residual land value minus your own bid margin.

Example location
  • Residual land value (maximum bid)€ 520,144
  • Bid at an example margin of 10%€ 468,130
  • Tender minimum price€ 300,000
  • Headroom over the minimum price€ 168,130

Which plan is it in?

Team

€ 400per user / month, excl. VAT

Studies with the development costs and the residual land value are in Team, with everything from Basis included.

Also in Enterprise.

Frequently asked questions about development costs and land value

I already have my cost breakdown in Excel. What does this add?

Your spreadsheet works with whatever you put into it. In Revelop the cost breakdown updates when the design changes, every number shows its source and price level, and the fees come from the municipality's by-law. Nobody has to guess what each cell does any more.

Which construction costs does Revelop use?

Those of your own organisation. Revelop does not supply construction costs. Where you have not filled anything in yet, an example value stands in, so you can see what you still need to supply.

Does the breakdown comply with NEN 2699?

The costs follow the NEN 2699 structure, with categories A to G. It is not a check against the standard itself, and we do not reproduce the text of the standard.

How reliable is the result?

As reliable as the assumptions behind it, and you can see all of them. That is why the sensitivity sits right under the land value: it shows which assumption carries the most weight.

Does this also work for a whole area development?

Yes. In an area study Revelop also works out the land balance of the plan area and its plots, and shows what lower revenue or a year's delay does to the land value.

Run the numbers on your own site.

In thirty minutes we show you how a study works out the land value for a site you choose.

Call me back

Leave your number and we will call you back as soon as we can, on a working day. No calendar, no commitment.

We only use your number to call you back.